Identification of Risks of Delays in the Construction of Jalan Animal Hospital
DOI:
https://doi.org/10.33541/mr.v6i2.7350Keywords:
Risk Management, Project Delays, Hospital Construction, Qualitative Analysis, Risk MatrixAbstract
Timely completion of hospital construction projects is crucial to support public health services, but delays are a common problem that has an impact on increased costs and delayed social benefits. This study aims to identify the risk factors for causing delays and analyze the level of significance in the case study of the construction of the Jalan Kehewanan Hospital in Tenggarong. This study uses a qualitative approach with primary data collected through semi-structured interviews with the implementing contractor. Data analysis is carried out by mapping identified risks into risk matrices based on likelihood and impact. The results of the study identified four main risk factors, namely (1) Design Changes, (2) High Rainfall, (3) Restrictions on Working Hours by Residents, and (4) Equipment Damage. The risk assessment showed that Design Change (value 15) and High Rainfall (value 12) were the two factors with the most significant High risk level, while the other two factors were at Medium levels. These findings imply that project management should prioritize mitigation strategies on aspects of internal design management and anticipation of external weather factors to ensure the smooth running of the project
References
Abd El-Razek, M. E., H. A. Bassioni, and A. M. Mobarak. 2008. "Causes of Delay in Building Construction Projects in Egypt." Journal of Construction Engineering and Management 134 (11): 831–41. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:11(831).
Assaf, S. A., and S. Al-Hejji. 2006. "Causes of Delay in Large Construction Projects." International Journal of Project Management 24 (4): 349–57. https://doi.org/10.1016/j.ijproman.2005.11.010.
Baloi, D., and A. D. F. Price. 2003. "Modelling Global Risk Factors Affecting Construction Cost Performance." International Journal of Project Management 21 (4): 261–69. https://doi.org/10.1016/S0263-7863(02)00017-0.
Budianto, A., and A. Setyawan. 2020. "Identifikasi Faktor-Faktor Risiko Dominan Penyebab Keterlambatan Proyek Konstruksi Gedung Bertingkat di Surakarta." Matriks Teknik Sipil 8 (2): 263–70. https://doi.org/10.20961/matriks.v8i2.40453.
Devedo, M. G. D., A. Ismail, and R. Nadhirawty. 2025. "Identifikasi Risiko Keterlambatan dalam Pembangunan Perumahan Cluster Verdi Summarecon." Jurnal Mitra Teknik Sipil 7 (1): 11–20. https://ejurnal.umri.ac.id/index.php/JMTS/article/view/4594.
Devedo, M. G. D., C. M. Sari, and M. I. A. Supriyanto. 2025. "Penilaian Tingkat Risiko Keterlambatan pada Proyek Rekonstruksi Jalan Stadion Kompleks Palaran." Jurnal Rekayasa Konstruksi Mekanika Sipil (JRKMS) 8 (1): 75–86.
Doloi, H., A. Sawhney, and K. C. Iyer. 2012. "Structural Equation Model for Investigating Factors Affecting Delays in Indian Construction Projects." Construction Management and Economics 30 (10): 869–84. https://doi.org/10.1080/01446193.2012.717705.
Fugar, F. D. K., and A. B. Agyakwah-Baah. 2010. "Delays in Building Construction Projects in Ghana." Australasian Journal of Construction Economics and Building 10 (1/2): 103–16. https://doi.org/10.5130/ajceb.v10i1/2.1592.
Ismael, Idzurnida. 2023. "Keterlambatan Proyek Konstruksi Gedung: Faktor Penyebab dan Tindakan Pencegahannya." Jurnal Teknik Sipil, Institut Teknologi Padang.
Le-Hoai, L., Y. D. Lee, and J. Y. Lee. 2008. "Delay and Cost Overruns in Vietnam Large Construction Projects: A Comparison with Other Selected Countries." KSCE Journal of Civil Engineering 12 (6): 367–77. https://doi.org/10.1007/s12205-008-0367-7.
Project Management Institute. 2021. A Guide to the Project Management Body of Knowledge (PMBOK® Guide). 7th ed. Newtown Square, PA: Project Management Institute.
Sambasivan, M., and Y. W. Soon. 2007. "Causes and Effects of Delays in Malaysian Construction Industry." International Journal of Project Management 25 (5): 517–26. https://doi.org/10.1016/j.ijproman.2006.11.007.
World Health Organization. 2010. Framework for Assessing Health Systems. Geneva: WHO Press.
Zou, P. X. W., G. Zhang, and J. Wang. 2007. "Understanding the Key Risks in Construction Projects in China." International Journal of Project Management 25 (6): 601–14. https://doi.org/10.1016/j.ijproman.2007.03.001.