Cost Analysis of Project Planning for the G2 Building Structure Construction at Warmadewa University Using the Building Information Modeling (BIM) Method

Penulis

  • I Gusti Agung Gede Nodya Dharmastika Universitas Warmadewa
  • Ida Ayu Cri Vinantya Laksmi Universitas Warmadewa
  • Made Mas Surya Wiguna Universitas Warmadewa
  • Putu Gede Suranata Universitas Warmadewa

Kata Kunci:

Building Information Modeling (BIM), Cost Planning, Cost Estimation

Abstrak

Cost planning is a crucial aspect of construction project execution to ensure budget efficiency and project success. This study aims to analyze the cost planning for the construction of the G2 Building structure at Warmadewa University using the Building Information Modeling (BIM) method. BIM is employed as the primary tool to generate a 3D model integrated with accurate and efficient cost estimation (quantity take-off). The study begins by collecting initial project design data, technical specifications, and a conventional budget plan (BOQ). Subsequently, this data is implemented in BIM software to create a 3D model of the building structure. This model is used to conduct quantity analysis and cost estimation based on the work volume automatically generated by BIM. The results show that the BIM method produces a cost planning estimate of IDR 13,622,950,957, while the conventional method estimates IDR 14,648,621,255, resulting in a difference of IDR 1,025,670,298 or 7%.

Diterbitkan

2025-07-28

Cara Mengutip

I Gusti Agung Gede Nodya Dharmastika, Ida Ayu Cri Vinantya Laksmi, Made Mas Surya Wiguna, & Putu Gede Suranata. (2025). Cost Analysis of Project Planning for the G2 Building Structure Construction at Warmadewa University Using the Building Information Modeling (BIM) Method. Jurnal Rekayasa Teknik Sipil Dan Lingkungan - CENTECH, 6(1), 20–27. Diambil dari https://ejournal.uki.ac.id/index.php/cen/article/view/6755