1.
Mardiansyah, Wahdianto RW, Wardana HS, Meganesia L, Siregar IM, Kusnadi H. Analisis Risiko Implementasi Pembangkit Listrik Tenaga Surya (PLTS) Berkapasitas 6.480 KWP di Universitas Pamulang. MR [Internet]. 2025 Jun. 26 [cited 2025 Aug. 2];6(1):19-28. Available from: https://ejournal.uki.ac.id/index.php/mr/article/view/6933