Purba, M. and Indriasari (2021) “DELAY DETERMINANT FACTORS IN INDUSTRIAL CONSTRUCTION PROJECTS (CASE STUDY: CIKARANG AREA INDUSTRIAL )”, Jurnal Rekayasa Teknik Sipil dan Lingkungan - CENTECH, 2(1), pp. 1-11. doi: 10.33541/cen.v2i1.2758.