ANALISIS PERSEDIAAN MATERIAL DENGAN METODE MATERIAL REQUIREMENT PLANNING PADA PEKERJAAN STRUKTUR PROYEK RSUD SIDOARJO
Abstract
In the world of construction, materials play an important role in the running of a project. Material is one of the main raw materials that greatly affects the amount of project costs. Material inventory affects the progress of work and planned costs. The problem of shortage and excess stock of materials is related to material inventory management. Therefore, material inventory planning is something that must be considered. This study aims to analyze and calculate the total cost of material inventory efficiently and minimally in the Construction of the Integrated Central Building of RSUD Sidoarjo Regency. The material inventory method used is Material Requirement Planning (MRP) with three approach techniques, namely Lot For Lot (LFL), Economic Order Quantity (EOQ), and Period Order Quantity (POQ). The results of this study obtained lot sizing techniques with efficient MRP methods and minimum total material inventory using the Period Order Quantity (POQ) technique except for D10 Iron and D19 Iron using Lot For Lot (LFL) techniques. The costs incurred in the material inventory of each type of 4th-floor structure material are Multiplex Material t = 9 mm melamine Rp. 133,601,679, Iron Concrete D10 Rp. 212,685,500, Iron concrete D13 Rp. 171,485,930, Iron concrete D16 Rp. 56,760,803, Iron concrete D22 Rp. 155,031,888, and Concrete ready mix fc '= 25 Mpa Rp. 292,512,673. By using the right lot-sizing technique, it is expected to solve the problem of lack or excess material
References
Waktu Tunggu Pengadaan Material Beton Pada Beberapa Proyek Di Jakarta. Jurnal Rekayasa Teknik Sipil Dan Lingkungan, 3(2), 91–98.
Jin, O. F., Tampubolon, S. P., Supriadi, D., & Santoso, I. B. (2023). Faktor-Faktor Pemilihan Pemasok Material Bangunan. Jurnal Rekayasa Teknik Sipil Dan Lingkungan, 4(2), 147–153.
Kusuma Ningrat, N., & Gunawan, S. (2023). Pengendalian Persediaan Bahan Baku Untuk Meningkatkan Efisiensi Biaya Persediaan Dengan Menggunakan Metode Eoq ( Economic Order Quantity ) Di Umkm Kerupuk Nusa Sari Kecamatan Cimaragas Kabupaten Ciamis. Jurnal Industrial Galuh, 5(1). https://doi.org/10.25157/jig.v5i1.3058
Letari, S. S., Widodo, A. P., Soebijono, T., & Bambang, H. (2022). Analisis Metode Penentuan Rencana Kebutuhan Bahan Baku Yang Efektif dan Efisien Studi Kasus PT Rafansa Prima Usaha. Jurnal Riset Mahasiswa Akuntansi, 10(2).
Lienardo, D. A., & Jin, O. F. (2020). Analisis Perbandingan Metode Material Requirements Planning (MRP) Dengan Metode Pengendalian Material Di Proyek A. JMTS: Jurnal Mitra Teknik Sipil, 3(2), 223.
Pratama, N. W. Y., & Adistana, G. A. Y. (2021). Analisis Persediaan Material Pada Proyek Gedung Kantor DPRD Surabaya Menggunakan Metode Material Requirement Planning (MRP). Rekayasa Teknik Sipil, 151, 1–17.
Ridanni, S. B., & Khiroh, S. M. (2023). Pengendalian Persediaan Bahan Baku dengan Pendekatan Lot Sizing dalam Mendukung Sistem Material Requirement Planning (Studi Kasus PT. Mataram Paint). Prosiding Senakama, 2.
Rika Wulandari, A. W. (2023). Analisis Metodematerial Requirement Planning (MRP) Terhadap Pengendalian Persediaan Material Pada Pekerjaan Struktur Proyek Pembangunan Gedung Ukm Center Kampus Ketintang Unesa Rika. Rekayasa Teknik Sipil, 5(1), 1–11.
Riskijah, S. S., Teknik, J., Politeknik, S., & Malang, N. (2019). Analisis Persediaan Material Beton Bertulang. PROKONS: Jurnal Teknik Sipil, 13(1), 43–49.
Savira, A. N., & Handayani, K. D. (2021). Analisis Persediaan Material Dengan Metode Material Requirement Planning (MRP) Pada Pekerjaan Struktur Lantai Basement 2 Proyek Pembangunan Apartemen Westown View Wiyung Surabaya. Rekayasa Teknik Sipil, 1–11.
Sinipat, L., & Beatrix, M. (2023). Analisis Kebutuhan Material Besi Tulangan Pada Bending Schedule Pada Proyek Pembangunan Sekolah Cita Hati Surabaya. Jurnal Taguchi : Jumlah Ilmiah Teknik Dan Manajemen Industri, 3, 668–701.
Sutoni, A., & Azis, S. A. (2021). Analisis Sistem Persediaan Material dalam Proyek Pembangunan Perumahan dengan Menggunakan Metode Economic Order Quantity. IKRA-ITH TEKNOLOGI: Jurnal Sains & …, 5(1), 1–7. https://journals.upi-yai.ac.id/index.php/ikraith-teknologi/article/download/871/811
Wahyuni, T., & Wardhono, A. (2017). Analisis Persediaan Material Pada Pembangunan Proyek My Tower Hotel & Apartment Dengan Menggunakan Metode Material Requirement Planning (MRP). Rekayasa Teknik Sipil Vol., 1(1), 71–85.
Wibawanti, Y. (2019). Analisis Perencanaan Kebutuhan Material Proyek dengan Metode Material Requirement Planning. STRING (Satuan Tulisan Riset Dan Inovasi Teknologi), 3(3). https://doi.org/10.30998/string.v3i3.3601
Widhiawati, I. A. R., Dewi, A. A. D. P., & Sngkara, K. A. (2022). Analisis Perencanaan Persediaan Material Proyek Dengan Metode Material Requirement Planning (MRP). Jurnal Ilmiah Teknik Sipil, 26(1), 66–74.
- View 91 times Download 91 times Paper 6 (Bahasa Indonesia)
Copyright (c) 2024 Alifia Alifia, Budi Witjaksana
This work is licensed under a Creative Commons Attribution 4.0 International License.
Hak Cipta atas Tulisan Karya Ilmiah
Bersama dengan ini saya sebagai penulis utama menyatakan bahwa paper yang saya kirimkan untuk dipublikasikan melalu Jurnal Rekayasa Teknik Sipil dan Lingkungan adalah benar merupakan hasil orisinil Tulisan Karya Ilmiah yang merupakan hasil penelitian/kajian yang saya lakukan dan belum pernah dipublikasikan pada penerbit Jurnal ilmiah lain di Indonesia.
Jika di kemudian hari ternyata ditemukan bukti adanya hal-hal yang tidak sesuai dari pernyataan diatas maka saya bersedia menerima konsekuensi yang diberikan oleh Dewan Redaksi Jurnal Rekayasa Teknik Sipil dan Lingkungan serta paper yang telah diterbitkan akan DIBATALKAN dan dinyatakan sebagai hasil karya PLAGIASI.