Abstract

ABSTRACT

Technological developments in the construction industry have led to digitalization. One of them is the construction industry starting to implement Building Information Modeling (BIM). BIM is a system for managing information into building models in digital form. BIM processes input into information in the form of building modeling as an aid in the decision-making process at each stage of a construction project. In its application, BIM is still not optimal and has many obstacles. Of the 68 contractors in the city of Denpasar, only 3 contractors have used BIM in implementing their construction projects. Therefore, it is necessary to carry out a study to find out the factors that hinder the implementation of BIM among contractors in the city of Denpasar. The data collection method was carried out using a closed questionnaire which was distributed to 68 contractors in the city of Denpasar. The collected data was analyzed using Principal Component Analysis (PCA) factor analysis. The analysis carried out produced 3 factors that hindered the implementation of BIM in the city of Denpasar. These 3 factors include: difficulty in starting to implement BIM, high costs in implementing BIM, BIM is not a target for contractors. The third factor, namely that BIM is not the contractor's target, is the most dominant factor with the highest mean data value of 3.907.

Keywords: Building Information Modeling (BIM); Obstacle Factor; Contractor; Factor Analysis

 

References

Adnyana, I.B.P., Anwar, N., Soemitro, R.A.A., Utomo, C. 2015. Critical Success Factors of Public-Private-Community Partnership in Bali Tourism Infrastructure Development. Journal of Sustainable Development, .

Ahmed, S. 2018. Barriers to Implementation of Building Information Modeling (BIM) to the Construction Industry: A Review. Journal of Civil Engineering and Construction, 7(2).

Ahuja, V., Yang, J., Shankar, R. 2009. Study of ICT Adoption for Building Project Management in the Indian Construction Industry. Automation in Construction, 18(4).

Babatunde, S.O., Udeaja, C., Adekunle, A.O. 2021. Barriers to BIM Implementation and Ways Forward to Improve Its Adoption in the Nigerian AEC Firms. International Journal of Building Pathology and Adaptation, 39(1).

Chan, C.T.W. 2014. Barriers of Implementing BIM in Construction Industry from the Designers’ Perspective: A Hong Kong Experience. ISSN Journal of System and Management Sciences Journal of System and Management Sciences, 4(2).

Criminale, A., Langar, S. 2017. Challenges with BIM Implementation: A Review of Literature. 53 Rd ASC Annual International Conference Proceedings, (April).

Dalian, J., Mochtar, K. 2021. Analisis Faktor Dan Variabel Yang Menghambat Penerapan 5D Bim Pada Pembiayaan Proyek Konstruksi Di Indonesia. Prosiding CEEDRiMS, .

Deng, Y., Li, J., Wu, Q., Pei, S., Xu, N., Ni, G. 2020. Using Network Theory to Explore Bim Application Barriers for BIM Sustainable Development in China. Sustainability (Switzerland), 12(8).

Enshassi, A., AbuHamra, L., Mohamed, S. 2016. BARRIERS TO IMPLEMENTATION OF BUILDING INFORMATION MODELLING (BIM) IN THE PALESTINIAN CONSTRUCTION INDUSTRY. International Journal of Construction Project Management, 8(2): 104–123.

Farooq, U., Ur Rehman, S.K., Javed, M.F., Jameel, M., Aslam, F., Alyousef, R. 2020. Investigating Bim Implementation Barriers and Issues in Pakistan Using Ism Approach. Applied Sciences (Switzerland), 10(20).

Hamma-Adama, M., Kouider, T., Salman, H. 2020. Analysis of Barriers and Drivers for BIM Adoption. International Journal of BIM and Engineering Science, 3(1): 18–41.

Hatem, W.A., Abd, A.M., Abbas, N.N. 2018. Barriers of Adoption Building Information Modeling (BIM) in Construction Projects of Iraq. Engineering Journal, 22(2).

Johartiming, E.F., Winarto, J.S., Chandra, H.P. 2021. Investigasi Implementasi Building Information Modelling Pada Sektor Konstruksi Di Surabaya. Jurnal Dimensi Pratama Teknik Sipil, 10(02).

Khoirul Amin, H., Agus Suroso. 2022. Faktor Faktor Penghambat Penerapan Teknologi Building Information Modelling Pada Tahap Perencanaan Proyek Jalan Tol. TEKNOSAINS : Jurnal Sains, Teknologi Dan Informatika, 10(1).

Leśniak, A., Górka, M., Skrzypczak, I. 2021. Barriers to Bim Implementation in Architecture, Construction, and Engineering Projects—the Polish Study. Energies, 14(8).

Likita, A.J., Jelodar, M.B., Vishnupriya, V., Rotimi, J.O.B., Vilasini, N. 2022. Lean and BIM Implementation Barriers in New Zealand Construction Practice. Buildings, 12(10).

Liu, S., Xie, B., Tivendal, L., Liu, C. 2015. Critical Barriers to BIM Implementation in the AEC Industry. International Journal of Marketing Studies, 7(6).

Manzoor, B., Othman, I., Gardezi, S.S.S., Altan, H., Abdalla, S.B. 2021. Bim-Based Research Framework for Sustainable Building Projects: A Strategy for Mitigating Bim Implementation Barriers. Applied Sciences (Switzerland), 11(12).

Marefat, A., Toosi, H., Mahmoudi Hasankhanlo, R. 2019. A BIM Approach for Construction Safety: Applications, Barriers and Solutions. Engineering, Construction and Architectural Management, 26(9).

Memon, A.H., Rahman, I.A., Memon, I., Azman, N.I.A. 2014. BIM in Malaysian Construction Industry: Status, Advantages, Barriers and Strategies to Enhance the Implementation Level. Research Journal of Applied Sciences, Engineering and Technology, 8(5).

Nelson, N., Tamtana, J.S. 2019. FAKTOR YANG MEMENGARUHI PENERAPAN BUILDING INFORMATION MODELING (BIM) DALAM TAHAPAN PRA KONSTRUKSI GEDUNG BERTINGKAT. JMTS: Jurnal Mitra Teknik Sipil, 2(4).

Nguyen, T.Q., Nguyen, D.P. 2021. Barriers in Bim Adoption and the Legal Considerations in Vietnam. International Journal of Sustainable Construction Engineering and Technology, 12(1).

Olanrewaju, O.I., Chileshe, N., Babarinde, S.A., Sandanayake, M. 2020. Investigating the Barriers to Building Information Modeling (BIM) Implementation within the Nigerian Construction Industry. Engineering, Construction and Architectural Management, 27(10).

Pantiga, J., Soekiman, A. 2021. KAJIAN IMPLEMENTASI BUILDING INFORMATION MODELING ( BIM ) DI DUNIA KONSTRUKSI INDONESIA Magister Manajemen Proyek Konstruksi , Universitas Katolik Parahyangan , Bandung. Rekayasa Sipil, 15(2).

Purnomo, C.C., Hutabarat, L.E., Putri, R., Gultom, W. 2022. Kajian Tingkat Implementasi Dan Hambatan Penggunaan Building Information Modelling (BIM). Oktober, 3(2).

Santoso, S. 2010. Statistik Parametrik, Konsep dan Aplikasi dengan SPSS. 1st Ed. Jakarta: PT Elex Media Komputindo.

Siebelink, S., Voordijk, H., Endedijk, M., Adriaanse, A. 2021. Understanding Barriers to BIM Implementation: Their Impact across Organizational Levels in Relation to BIM Maturity. Frontiers of Engineering Management, 8(2).

Stanley, R., Thurnell, D. 2014. The Benefits of, and Barriers to, Implementation of 5D BIM for Quantity Surveying in New Zealand. Australasian Journal of Construction Economics and Building, 14(1).

Utomo, F.R., Rohman, M.A. 2019. The Barrier and Driver Factors of Building Information Modelling (BIM) Adoption in Indonesia: A Preliminary Survey. IPTEK Journal of Proceedings Series, 0(5).

Waqar, A., Qureshi, A.H., Alaloul, W.S. 2023. Barriers to Building Information Modeling (BIM) Deployment in Small Construction Projects: Malaysian Construction Industry. Sustainability (Switzerland), 15(3).

Wong, S.Y., Gray, J. 2019. Barriers to Implementing Building Information Modelling (BIM) in the Malaysian Construction Industry. IOP Conference Series: Materials Science and Engineering. 495. 1.

Wu, P., Jin, R., Xu, Y., Lin, F., Dong, Y., Pan, Z. 2021. The Analysis of Barriers to Bim Implementation for Industrialized Building Construction: A China Study. Journal of Civil Engineering and Management, 27(1).

Zhafirah, H., Oktaviani, C.Z., Maulina, F. 2023. Identifikasi Faktor Pendukung Dan Penghambat Adopsi Bim Oleh Kontraktor Di Provinsi Aceh. Jurnal Rekayasa Sipil (JRS-Unand), 19(1).

Zhou, Y., Yang, Y., Yang, J. Bin. 2019. Barriers to BIM Implementation Strategies in China. Engineering, Construction and Architectural Management, 26(3).

Published
2024-04-30
How to Cite
Nodya Dharmastika, Gede Suranata, P., & Cri Vinantya Laksmi, I. A. (2024). ANALISIS PENGHAMBAT PENERAPAN BUILDING INFORMATION MODELING (BIM) PADA KONTRAKTOR DI KOTA DENPASAR. Jurnal Rekayasa Teknik Sipil Dan Lingkungan - CENTECH, 5(1), 13-23. https://doi.org/10.33541/cen.v5i1.5605